Power Engineering
Energo-TES Ltd.
The structure of industrial and investment complex DARA Group also includes the energy industry company Energotec –TES Ltd., which performs design and construction of cogeneration power plant based on gas turbine engine manufacturing plant GTR&PC Zorya – Mashproekt with capacity from 2,5 to 100 MB.
Cogeneration technology helps to increase the utilization of fuel, which contributes to significant economy of fuel and saving of energy resources.
Cogeneration technology helps to increase the utilization of fuel, which contributes to significant economy of fuel and saving of energy resources.
In view of a great interest of the state in sphere of development of “green” energy on the territory of Ukraine and in the world in general, DARA Group is constantly making its own significant contribution to the development of environmentally friendly and renewable energy. In this case DARA Group pursues not so much its business interests, as the idea of preservation of our planet for generations to come.
For the time being, DARA Group is successfully implementing the project of construction of 2 hydroelectric power plants in Zabolotiv village (Snyatyn district, Ivano-Frankivsk region) with a capacity 4000 kW each.
Furthermore, the Company is now at the stage of obtaining permission documentation for construction of 4 hydroelectric power plants in such localities as Triytsya, Rudnyky, Borshchiv with a capacity 4000 kW each and in Zavallya with a capacity 3000 kW in the same Snyatyn district. Plus 2 hydroelectric power plants in the localities of Roztoky and Sloboda, Kosiv district, Ivano-Frankivsk region, with a capacity 3000 kW each.
DARA Group is planning to proceed with the active development of its activities in the field of “green” energy and is now launching the development of wind power plants projects on the territory of Ukraine, bearing in mind that the future of the world economy is in “green” energy.